COMMANDER TASK UNIT SEVEN POINT THREE POINT SIX U.S.S. LSM 250 c/o Fleet Post Office San Francisco, California File No. CTU7.3.6/A9 19 April 1948 Serial: 0018 Subject: Report of Submarine Cable Operations. (con't) and LSM-378. These ships had previously been fitted out for cable laying at the Teminal island and Pearl Harbor Naval Shipyards respectively, under BuShips direction. The cable was coiled on the main deck and an "A" frame, with a large block mounted at the apex provided a fairlead directly over the coil. From this block the cable lead through a series of blocks and a snubbing device on the super- structure deck to a block om an outrigger which projected from the ship's side forward. Dupli- cate fairleads, snubbing devices and outriggers made it possible to pay out the cable from either side. The cable was always leid fron the weather side. 32 Sectim VII An electrically driven cable

Select target paragraph3