The equipment should have included the following
pumps:
4
550 gpm @ 300-ft head
10 155 gpm @ 50-ft head
25
ai.
They should arrive with the earliest equipment.
Almost all equipment employed used wire rope.
tion of this item was heavy.
ak.
50-ft head
Roller conveyors were most useful and should be
liberally provided.
aj.
SO gpm®
Consump-
Replacement stocks should not be overlooked.
Engineer Supply must stock large quantities of electrical
supplies end equipment.
Switches an’ similar equipment should be of
marine type, because of constant exposure to rust and corrosion.
al.
General building material stocksshould include liberal
quantities of 3/4-inch plywood, wall board, long lengths of 2" x 4",
1" and 2" dimension lumber, building hardware, and cement.
am.
If buildings are to be again rehabilitated for occu-
pency, amule quantities of light colored paint, both inside and outside, with spray guns, should be included in early stocks of building
Light colors are preferred to dark because of their cool-
material.
ing effect.
pancye
Rehabilitated buildings should be painted before occu-
This contributes greatly to morsle and cleanliness.
an.
at this site.
The DUKW is ene xtremely important piece of equipment
The 16 furnished here were the correct number.
They
operate most efficiently in the hands of a regular TC DUKW unit, for
thus they receive the special maintenance and parts service they require.