on 17 March and the forms for Gamma Station "B" removed, thus completing the construction phase of that job.
_
All surplus property and equipment was loaded out on the "Yancey"
on the 15th of March for shipment to the U.S.
The coaxial cable in
the meantime had been laid across the causeway and as far as the 400
foot station.
The period 19th to 22nd March was used to enlarge the tent
area to accommodate an anticipated influx of officers and civilian
workers.
The bulk of the working crews were knocked-off from 20th to 24th
March to concentrate on the development and constructionof a recrea-
tion center for U.S, Navy personnel on one of the small islands north
of Aoman,.
The steel crew continued to work on a split shift basis, installing
two curbs along ‘the causeway.
There, as beforetiring the:erection
of reinforcing steel, the need was felt for the TO & E welding generator
that had been left at the home station.
The curb job was finally
completed on 2] March.
On 23 March, a crew led by Q9QMMMMe commenced work on the
blast structures.
The same day an ARC Water Safety and Instruction
course was inaugurated at Eniwetok with Private First Class SE,
SE ad elyattending.
An additional job to the original assignment presented itself on
24, March when it became evident that the approaches to the Gamma .
.