PRIVACY ACT MP7 221A; Brvaqyen The forms on Gamma "A" were stripped on 6th and 8th March, revealing probably the best concrete finish of the entire project. It was at this time that a fifteen (15) KW generator was added to the power plant at the Timing Station which called for an alteration of the shed to house it. The 10th of March saw the arrival of the co-axial cable group and they started work immediately. Their line having been previously established, a ditch was laid open that they might start layingtheir cable. The causeway constructed by the Hawaiian Dredging Company was completed on the llth and with the fill job carried out by members of this unit, regular traffic across it became heavy. This offered a problem when the time came to lay the cable across the causeway, but delays in re-routing traffic lasted only a day or two. Gamma "C" were removed in the meantime. The forms for The Company Supply section under Lt. QM and Staff Sergeant QMMMes completed on the 11th a survey of all form 32's and submitted a requisition for newly authorized clothing and equipment on arrival at home station. All work on the Generator Shack and Timing Station was completed on 11 March. . cab Mer ee | All type "A" blast footings on Biijiri were completed on 12 March. The ComMbity's véteran grader operator was also lost on the 12th March when Technician Fourth Grade QQdeparted.for the VeSpopes ag on a 30 day emergency leave and eventual transfer to Hq 2d ESB. The wiring and utilities work on the Timing Station was completed SECTION VIb 85 PRIVACY ACT MA TERIAL REMOVE D

Select target paragraph3