7

-

FORE
KAJ Colio
23 Nov 78

FACT SHELT

SUBJECT:

Enjcbi Subsurface Contaminatlon

PURPOSE:

To provide current status of Enjebi (Janct) subsurface contamina-

tion.

BACKGROUND =

a. On 27 Sep 77, DOE-ERSP outlined to CJTG a ground zero (Rasy - X Ray

and Item sites) subsurface exploration plan for Enjebi.
fy NVO-140 data by backhoe soil profile sampling.

b.

The plan was to veri-

On 5 Oct 77, CJTG directed soil sampling priority to Lujor, boken,

Aomon and Runit.
It was implied by CJTG that the Enjebi subsurface was secondary to characterizing surface TRU contamination. This prioritization was
IAW the mission and personnel safety considerations inasmuch as subsurface

contamination presents less of an immediate hazard than surface contamination.

c. On 16 Aug 78, almost one year later, DOE-ERSP extracted 740 soil’.
samples in the Easy - X Ray and Item Ground Zero sites, using sidewall sam-

pling in backhoe trenches to a depth of 120 ec: (4 £t).
d.

On 30 Sep 78, DOE-ERSP reported to CJiG that two areas in the NW

quadrant of Enjebi had subsurface TRU greater than 1460 pCi/g, thereby exceeding Condition D. The assumed depth of* cut to excise the approximate 1307 cy

of subsurface TRU contamination was 100 em (3.3 [t).
DISCUSSION:

STATUS:

’

oe oo

Te gt 3

“gp

phpitlbond tao *

:
|

None

The Enjebi subsurface excision is scheduled to begin o/a 27 Nov 78.

Select target paragraph3