CHAPTER Ill, SECTION 2
Operation as compared to the Working

Temporary Camps

Estimates indicating the total costs for

Auxiliary Facilities
Construction

ment

Equipment

Procure-

The preceding were divided into DOD
Reimbursable,

DOD

Non-Reimburs-

able, and other User groups.

2.

The Estimate and Cost Report, which
included the same information as in
“1” and in addition indicated the cost

to date by major elements of the JTF-7
program and project.

3.

The Special Test Cost Report, which
summarized the Cost Estimate Report
and reflected the costs to date of the

the major Users.

During March 1958, a revised Chart of

Accounts wasissued, which listed additions and

deletions to date. During the latter part of that

month, a change in the method of handling the

charges for advance equipment procurement was

instituted. Instead of charging the Identification

Number for which equipment was procured, an
inventory was maintained and the charge was
made to the construction item as the equipment was installed. The equipment remaining
-uninstalled at year-end wasreflected in the Current Use Inventory.
Effective November 1957, a redistribution

of FY 1958 engineering costs was accomplished.

10 MONTHS
FY 1957

FY 1958

$ 2,169,014.34

$22,242,784.04

Maintenance of Proving Ground

4,755,472.40

Operation of P.G. Facilities (Net)

FULL SCALE WEAPONS,
EXPENDABLE TEST
FACILITIES, ENIWETOK
PROVING GROUND
Hardtack, Phase I

3 MONTHS
FY 1959

$

TOTAL

909,709.91

$25,321,508.29

7,114,212.44

1,931,135.56

13,800,820.40

6,554,279.86

12,307 ,845.76

3,382,904.40

22,245,030.02

358,214.33

1,082,660.25

536,995.62

1,977,870.20

18,836,980.93

42,747,502.49

6,760,745.49

63,345,228.91

TEST SITE OPERATIONS,
ENIWETOK PROVING
GROUND

Scientific Support
Total Construction & Operations
Reimbursable Work (Credit)
Net Total Construction &
Operations

Biology & Medicine
Total Operating Programs

(150,621.70)

(3,304,698.51)

(351,498.79)
6,409,246.70

(3,806,819.00)

13,686,359.23

39,442,803.98

7,299.28

4,032.53

13,693,658.51

39,446,836.51

6,409,246.70

59,549,741.72

686,054.92

5,638,647.76

63,612.10

6,388,314.78

75,925.46

761,980.38

829,808.75
6,468,456.51

83,414.39
147,026.49

989,148.60
—_7,377,463.38

$14,455,638.89

$45,915,293.02

$6,556,273.19

$66,927,205.10

-oO-

59,538,409.91

11,331.81

PLANT & EQUIP. CHANGES
Construction

Equip. Not Incl. In Constr.

Projects

Total P & E Programs

TOTAL PROGRAM COST
Table No. 3-1.

Page 336

Program Costs From September 1956 Through
September 1958.