CHAPTER Il, SECTION 3 STATIONS: 125.01 through 125.09 SITE: Irene, 125.01 through .06; Yvonne, 125.07 through .09 USER: DOD /RW PURPOSE: Pressure Recording Cannisters PARTICIPATION: 125.01 through .06, 21; 125.07 through .09, 20 DESIGN PSI: None CONSTRUCTION: 4-17-58/4-26-58 No engineering was performed for this station. The Contractor provided support only. STATIONS: 131.01 through 131.04 SITE: James, Irwin, Henry, Keith USER: DOD/NOL PURPOSE: Temperature and Humidity Recorder Station PARTICIPATION: 43 DESIGN PSI: None CONSTRUCTION: 4-8-58, 4-14-58 Each of these stations consisted of three concrete anchor blocks to secure guys from a 24-foot-high User-furnished and installed tower. PARTICIPATION: 163.01 - .02, 43; 163.03 - .06, 44 DESIGN PSI: None CONSTRUCTION: 4-10-58;4-26-58 To measure variation in water level, 16-foot wood poles were anchored 4 feet into concrete on the reef. The poles were painted alternately black and white. A cable reel support fabricated from 3-inch-diameter pipe was provided for each station. STATIONS: 170.01 through .08 SITE: 170.01 - .03, Helen; 170.04 - .08, Yvonne USER: DOD/BRL PURPOSE: Pressure-Time Measurement PARTICIPATION: 170.01 - .04, 21; 170.05 - .08, 20 DESIGN PSI: None CONSTRUCTION: 3-10-58 /4-26-58 From one to three concrete blocks, 4 feet square by 2 or 214 feet deep, were used at each of these stations to house gage cannisters. The blocks were set flush with the grade. STATIONS: 171.01, 171.04, and 171.05 SITE: Helen, Yvonne USER: DOD/BRL PURPOSE: Pressure-Time Measurement STATIONS: 160.01 through 160.03 SITE: Henry, Elmer, James USER: DOD/SIO PURPOSE: Wave Recording PARTICIPATION: 171.01, 21; 171.04 - .05, 20 160.03, 44 DESIGN PSI: None CONSTRUCTION: 3-11-58/4-20-58 PARTICIPATION: 160.01 -.02, 43; DESIGN PSI: CONSTRUCTION: 4-8-58/5-3-58 None Stations 171.01, Helen, and 171.04, Yvonne, Portable wood shacks 5x6x64 feet high, consisted of a one-gage tower, and Station 171.05, Yvonne, consisted of two-gage towers. cated on the personnel pier on Elmer and was supplied with line power. 3 feet high and consisted of two 8-inch pipes STATIONS: 163.01 through 163.06 streamlined, using full height angles. The foot- SITE: 163.01, James - Irwin Reef; .02, James; .03 and .06 Henry; .04 Glenn; .05 Irwin comprised these stations. Station 160.02 waslo- USER: DOD SIO PURPOSE: Measure Water Level Rise Page 82 The gage towers for Stations 171.01 and .04 were adjacent to each other and fastened with full height side plates. The front and rear were ing for the tower was 4x8x4-foot deep and the tower was embedded 3 feet. The gage towers for Station 171.05 were existing towers from REDWING Station 117 series relocated from Site Pearl to Yvonne. Stations 171.02 and .03 were deleted prior to their installation.

Select target paragraph3