CHAPTER If, SECTION 3 from the elevator and ladder located on the opposite side of the tower, a catwalk was framed with the platform members. A wire rope catenary supported a %-inch styroflex from the platform to Station 71 located below. STATION: 90 SITE: Nan USER: EG&G PURPOSE: Observation Tower PARTICIPATION: All Bikini Events, and All Eniwetok Events, Except 1 and 15 DESIGN PST: None CONSTRUCTION: 4-1-58,/7-25-58 An existing 300-foot triangular steel tower, 20 feet on a side with corner guys at three levels, was rehabilitated to REDWING condition. Modification to the tower included the addition of Station 82.02 to the 200-foot level and a new power line to the 275-foot level. Included in this tower was the cab, Station 1510. STATION: 91 SITE: Elmer USER: EG&G PURPOSE: Observation Tower PARTICIPATION: All Events DESIGN PSI: None For Tower (See other Stations on Tower for their Design Loads) a Boe CONSTRUCTION: 10-2-57/8-16-58 This 300-foot steel tower, in stock at EPG but not previously erected, was triangular in plan section, 20 feet on a side, similar to Station 90 on Nan, except for guys at the 250-foot level “ay aby (Neg. No. W-V-255-2) Figure No. 2-30. 300-Foot Tower Station 91 and Various Platform Stations. only, The existing connection details were modi- fied at the 250-foot level for fastening more rigid guys to limit tower deflection and torsion. Two guys splayed at each of the three corners to accomplish this. The cab in stock was not utilized but was replaced by a new structure discussed under Station 1511. After the bare tower was erected and when all the stations located on the tower were made known, the tower framing was reinforced for anticipated loads by field welding two structural angles to the main tower legs up to the 250-foot level, replacing the diagonal bracing between the 25- and 75-foot levels and by adding diagonal bracing between the 75- and 150-foot levels and between the 200- and 28715-foot levels. To protect against uplift, additional concrete was poured around the tower footings. Page 80 The elevator car was modified to include a scissors-type gate, and the elevator hoist was modified to utilize a slack rope device which maintained tension on the elevator support cables. The tower was provided with obstruction lights at the top and at the 150-foot level and ground floodlights at the 25-foot level. The power distribution panel and signal terminal cabinets were located in an enclosure at the base of the tower. A steel framed, aluminum covered shelter, 20x15x10-foot high, housed the elevator hoist on the ground and was located about 45 feet from the tower centerline.

Select target paragraph3