in preparing these charts were furnished by participating organizations.
a.

DEFINITIONS
13.9

Fig. 3-12 shows the relation of the
cost of support services performed
for test organizations to the number
of scientific personnel at EPG. This
chart reflects an increase in support
requirements with an increase in
scientific personnel as the test period
is approached, and a corresponding

Definitions of the major cost categories
are aa follows:
EXPENDABLE TEST CONSTRUCTION includes all costs of
towers, scientific stations, and other
facilities, including temporary camps,
constructed in test areas subject to
damage or destruction during operations, and those scientific structures

in non-test areas that are constructed
for a particular operation.

decrease in support requirements and
scientific personnel subsequent to the
test period.

b.

13.7.

TEST SITE OPERATIONSinclude
all costs incurred in the maintenance
and operation of the test site, such
as maintenance, operation of facilities, and support services provided to
participating test organizations on a
Special Work Orderbasis.

Fig. 3-13 shows the trend of costs for
maintenance and operation in relation to the total population trend,
as the test period is approached and
passed.

TECHNICAL SUPPORT SERVICES (shown as a line item under
Test Site Operations) include all
costs incurred by organizations, other
than scientific participants sponsoring tests, in technical support offullscale tests. Such costs cover but are
not limited to timing and firing; fire-ball and cloud formation photography; yield determinations; measurement of reaction history; radiological
services; meteorological services; and
microbarograph studies.

Test Planning and Evaluation, shown as

Category 3810 on the cost reports of
REDWINGandprevious operations, has been
discontinued as a budget and accounting cate-

gory for Scientific Contractors and is not includ-

ed in Fig. 3-10. Costs of this activity, totaling
$14,040,469, (incurred costs plus the estimated
costs to complete) are shown detailed byscientific program andproject in the Consolidated AEC
Test Cost Report — Operation HARDTACK as
of 31 July 1958, in accordance with JTF-Seven
cost reporting procedures.
13.8

The total cost reflected on Fig. 3-10 includes actual cost with estimates to complete as of the dates and during the periods
shown in the footnote.

BREAKDOWN OF FINAL COSTS
13.10 Breakdown of final costs of Operation
HARDTACK,Phase I, on a percentage
basis as shown below, reflects the distribution of
the ALO full-scale test dollar:

OPERATION HARDTACK, PHASE I
Expendable Test Facilities

Teat Site Operation
(15 months)

Total

Gross Cost
Including

Reimbursable

Percent

Gross Cost
Excluding
Reimbursable
Work

$25,344,100

41.4

$22,027,950

39.2

35,884,819

58.6

34,142,844

60.8

$56,170,794

100.0

Fe

sos

__Work

$61,228,919

100.0
=a

Page é8

Percent

x oo oo oe Oe Ot sss sss sss Ss

PART |II, CHAPTER 13