ctManat ee”

PART I, CHAPTER 7

CHAPTER 7
REFERENCES
7.1

The Report of the Manager, ALO, is
limited to those functions which are the
responsibility of TG 7.5; hence, the reader re-

quiring further information relating to Operation
HARDTACKis referred to the following listed

TITLE
Final Report of the Commander, TG 7.1 (Scientific)

TG 7.1

NS

Fina] Report of the Commander, TG 7.2 (Army)

TG 7.2

SO

Final Report of the Commander, TG 7.3 (Navy)

TG 7.3

FF

Final Report of the Commander, TG 7.4 (Air Force)

TG 7.4

7

Final Report of the Commander, JTF-Seven

CJTF-Seven

eo

AUTHOR

Report on “Study of the Safety Aspects of UHA and VHA
for Operation HARDTACK”by Safety Working Group
(21 Qct. 1957)

AFSWP

Final Report — ‘Operation HARDTACK CommunicationsElectronics”

JTF-Seven

Completion Report, Operation HARDTACK, Phase I

HE&N

Monthly Narrative Reports (January 1957 - October 1958)

HEN

10.

“TG 7.5 On-Site Rad-Safe Report”

HE&N, and OTO, ALO

11.

Long Range Improvement Planning at EPG, 1959 through
1962, (June 1958) - Volumes I and II

HEN

12.

Meteorogical Report on Operation HARDTACK (6 volumes)

JTF-Seven

13.

Status of WT Reports.

AEC Technical Information
Service Extension,
Oak Ridge, Tennessee

Pages 27-28

j

Select target paragraph3