* tne eee oe 4 ‘ ’ Technical Director 7 BEEHEBERBHEE The Technical Director will be responsible to the AMO, NV, for the following: 1. Preparation of a detailed technical plan. 2. Direction of the technical effort in the field. 3. Preparation of the final survey report. ( ——— Lawrence Livermore Laboratory (LLL) LLL will be responsible to the AMO, NV,for the following: 1. Furnishing a Technical Director. 2. Supporting sample collection and laboratory analysis required for dose assessment, pathway assessment and lens water studies. Environmental Protection Agency (EPA) EPA, NERC/LV will participate in the conduct of this survey by assisting the Technical Director in radiation measurement, and soil sampling programs. . University of Washington U of W will assist in sample collection, analysis and dose assessment as requested. Brookhaven National Laboratory (BNL) BNL will assist in sample collection, analysis and dose assessment as requested. EG&G, INC. DOE ARCHIVES EG&G will provide aerial photographic mapping of Bikini and Enyu Islands to facilitate position location in the ground survey (photographic mission completed May 23, 1975). 5002504 .