July 1958:

‘eterna

-

.

jp? 7

.

The construction preparation for Millrace as of this time are completion

of three 500 foot 36" holes with towers over 2 of the holes and sisnal lines
to be completed by 1 Sept.

All stations “will be in readiness arc eoitreetor's

Support availacle for field operations by Sept. 15."
In this revort is the first mention of operation framet cfcve “t sevs
the construction effort on the LASL tunnel has been vermorary haulted pending
results of an AEC-LASL-USGS conference on 1 August to discuss
Planning.

lonz term usage

Discussions have been going on with UCPL personnel to learn from

their tunnel experience and the techniques that they heve developed and are
wrking on.

-

LH

Al July message from Ogle at LASL to Graves at Eniwetok includes, among other

err

‘

things, the plans for the LASL participation in Millrace which are 3 safety shots and
2 tunnel shots.

Note that there is plenty of discussion as to what the organization at Nevada to
control the Millrace series would be, with tentative agreement at this time that Reeves
will be overall director with LASL and Livermore scientific advisors and some discussion
that the Livermore man will be called the senior advisor.

,

'

Through the first third of July, the rumors at Eniwetok as to the possible shots
to be done on Millrace and the possible cutoff dates and moratorium and other such
things were plentiful.

One of the conflicts of information was that LASL was proceeding

with 2 tunnels for 15 kiloton shots which were planned for completion in Dec. whereas
other information said that there could be no use of these tunnels before March of 59.
Information from Bob Watt on 11 July indicates that plans are for the tunnels design
to be reasonably firm in the first half of Aug. and for completion of the tunnels about
1 Dec.

|

Select target paragraph3