eM

ALOO Central Fites

MRA-7 Project 58 & 59 NTS (FY 58)

Indicates planning for safety shots at NTS in Feb-Mar 58, called
Cemssernceresree Te

"Project S8A-NTS", only LRL devices.

The LASL portion "58 Project

~--NTS" was done In Dec 37 and looked at properties of two proposed
designs upon one point detonation.

LRL carried out 58A in Feb & Mar with the Venus and Uranus tests,
respectively.
M & R Record Center

"635 NEVADA TEST SITE, 1/1/58 - 12/31/65
" Folder

.

7

BP

Here ts documentation of a visit to the Nevada
Test Site by French nuclear
experts that was classified in febuof28, The
stated purpose of the Trip.
Is to brief the experts on operational and safet
y aspects of U.S. full scale
“puclear weapons testing at the NTS. The visit
was sponsored jointly by the
DOD and AEC and there was the Intent _to limit the
discussion primarily to the
NTS with only a passing mention of the EPG. Among
those briefing the group

was JIm Reeves: and Al Graves.

,
M & R Records Center

—_

- 471,6-High Altitude Nuclear Effects" Folders covering 1958 through 1971,
one folder classified, theother unclassified.

G

1?

}

°

These folders should be used in conjunction with those entitled “Upper
Atmospheric Physics Group" since there are a number of cross-references
and some obvicus cross-fertilization in these two fields.
Reference to March1958 correspondence on a meeting or meetings held by

AFSNP, forerunner
ofDASA, with participation by ARPA, DDR&E, and the AEC

on the matter of planning for a high altitude detonation.

\

Select target paragraph3