RON
PLUX MEAS
NTS
Project Officer - T. D. Hanscome
bjectives
Participation in@® was arranged on the basis of
participation without duplication of Project 14.1 work.
om!
sphysical installation tor]
fs planned and effected on
Sslands west of Aomoen.
When the shot location was changed,
Pecipation was reduced to the amount indicated.
The project
tive is to provide data on neutron fluxes from boosted or
onuclear devices for comparison with neutron fluxes from
pei scaly tested devices.
‘he project is also concerned with
Satroguction of plutonium and germanium as neutron detectors
parter to test their usefulness.
<i Sblorumentstion
Detectors were installed on the 1403 line as shown in
—
2.4).
TABLE 2.3-1
INSTALLATIONS
= ¢
Barge
(ez)
,
Detectors
Remarks
-
$2100
Bp, U, Pu, Ge
Recovered except Np
S70
U, Pu, Ge
>
ry
“ee
FOO
6500
6x
Bp, U, Pu, Ge
U, Pu, 66
Ge
Station Destroyed
Station Destroyed
Complete Recovery
Complete Recovery