Prior to turning over mintenance and mpair responsibilitios
for baildings and facilities to the 4c as agreed (6), preventive

maintenance measures were taken with respect to buildings and tent
frames,

Bulldings that were not to yemin in use were closed anf as-

eured,

.

Under this progres, the owo tent areas were completely evacuated
as soon after the departure cs the bulk of the GRDUDIGE troops os
possible,

Ziectrical outlets wre secured, tent fruues painted, la-

trinss closed and semred, and the areas policed,

Personnel of ths

Serrison Force were housed in aluaisum barracks; tentege was shipped
to USAEPAC for rehabilitation,

:

4t approximately the sam time, Ordnance and Trensportation

personnal of the motor pool commenced overhauling eight Badger dis-

tillation units installed in the Haim Power Plant, This wrk was
Completed iz the latter part of July and the equipment was thentures

over to AIC persounel for maintenance, oe

yor a i

” eompleted in about ten anys.

py

' Rehabliitatios of “the rOld POL Area” |wes commenced‘88 June aa ee aa
Inspection of the otgxs tanks conpristig .
Qe wert
“Ty
af

:

the installation revealed that aiz ef ten wre unfit? for‘sietharls
2.

It ms dalioved that the memining tanks might‘ochcesvatiy berepaired<3.
and restored to service at a later éste if requirements are pressing.

These wre turned over %

AEG, Valves, pipelines, ‘fittings ang

other salvageahie materiids were recovered before the tankage was removed to the reef,

The entire area was levelled by bulldozer and hand

(6) “Wenorantua of Agreement for Matutenance, Eniwetok Taland, (Annex

4

"B" to Admin Order S,, 1I?-S, 4416 May 52)

19

.

P|
.

a om

e...2——

-_-

-—

:

an Bee

eee

|

i

7
.

“

we

BEST AVAILABLE COpy
REGRADED UNCLASSIFIED ORDER
Sco Are. BY DAN PER

(§52014

_s.

Select target paragraph3