SBCTIOn 1 C. M.INTEN/NCE, HOUSEKEEPING /.ND OFER/.TIONS. The weckly activities reports for this period of instellnent ere attached and are to be used for this section. Many of the charts and/or statistics included in Section V contain informstion to further elaborate on items of msintenence, housekeeping and operetions. In eddition, the following remerks and/or additions are eppropriete for inclusion in this section. a. Depot Supply In operation of the depot supply the infor- mation contained below reflects the increased amount of work performed, fugnentation of personnel from the Tiy group from Hawaii greatly aided _ in performing this increase work load. The rewarehousing program was completed. The following shows the square foot arca rewerehoused: 30,000 sq ft of closed warehouse 5,700 sy ft of shed storage §,000 sq ft of improved open area The rewarehousing in terms of tonnage would include approximately five hundred (500) tons of supplies handled. At its conelusion, the supplies were segregated by.technical services, and by supply groups within the technical service. ~ During the operation approximately 4,500 bin openings were constructed to provide for small parts which require bin storage. : / 7 The tonnage received during the above period is as follows; Quartermaster - - - - - 187.45 Orduance - - - - - ~ = 312.32 Engineer -~ --=--- 160.25 TONM.L---*------ 660. o1 REGRADED UNCLASS-FIED ORDER SEC ARMY BY DAMH PER Sea. Lg