G- OPERATIBG POINT
Operating equipment remeined at ec’ satisfactory or better

level daring the report period.

The power end dlatillation plant operated by Holmes &Harver,

funstioned satisfactorily during the period. One power failure was

exporicrtod during this tine during a heavy rainstorm.

os

Cremnisations equipzent oortimued to function mort satisfactorily.

Local wire fasiiities opersted whthout any incideat of note, excepting. 7
possibly a short otreutt of a. telephone sable to Air Fores headquarters,
auc to exocesive seepage,

However, this failure was loceted and

repairs mie in five hours,

-

‘

oo,

Teletypewriter and radio oirouits were om the Hote nest
satisfactory.

A oonspicious exception to this was the AACS radio

oiroult, which caused soneconcern because of several “dead” areas, © |
Technicians of AACS were attamting to solve this problea during

Cog o

the report period, but uo lasting progress waa males Since ae . ooo
FT Ans

ahanrel is of great taportanse te all atroraft, both wes wt Aosaty
~ aone Vee

Rat

continued effort to ccrrest the atetioultios masplanned forthe

immediate future,

wo

3

BEST AVAILABLE COPY

Coen
ant
RESRPNIN

erp pe

ee Aen
orm a pan
“OAS

oy
oa OtopPay

SO fo ov:

ER

GceCi4

Select target paragraph3