SECTION III

MAINTENANCE AND HOUSEKEEPING
Ao BASE YAOILITIES

The following paragraphs will describe in some detail activities
which deserve special mention for the purposes of this report,

If no

mention of @ base facility is made, that facility is either covered .
in another seotion of this report, or i¢ operated in a normal fashica

“2

with no unusual problems or progress. -.

(74

CONSOLIDATED MESS» A concentrated effort was made during.thi
period to either process for preservation or turn in to ‘the Quartere
master unused property or supplies.

More thai three tons of such

supplies were cleaned and treated, then turned ine

The south wing .

of the mess was converted into a storage arsa for ness tables and

chairs.

Plane to paintthe ceiling of. the entire building were

reclised ia part; as of 31 Decexber this project was approximtely

50% completed. Repairs and alterations other than the above were
~~

e.

ne

Pt Snot

oe

!

nouns asp ATRESTRIP. Continued deterioration of mcidanerurfased

roads and runways during the report ported necessitated tnareased ms .
waintenange on the part of Holmes and Yirverpersonals With ine
creased traffie, this problem will intensify. (See also Section I)
LAUNDEYs Personnel nsetcned to the Post Laundry during Yovexber

and December fluctuated.between eight and ten.

Continued demands

necessitated operation of this installation beyond the duty hours
required of other fanilities, inoluding every Saturday afternoon.

.

9

-

BEST AVAILABLE COPY
cEGR 2E
a

ICLASO EC
“ow Br gh

so

i

:

Select target paragraph3