Chlorination was ma poriedly 0.38 - 0.4 parts por uillion,

SEUAGE. Water borne sewage systens only ure in use on Iniwetor.
Sewerage facilities utilize salt water throughout,

A total of 11,86

ft of vitrified olay pipe (8") was installed originally with 8 ontfalls of 8” eorragated metal pips,

Ali cutfalls but one are on the

Lagoon side; they ranges from 80-750 ft in length for a total of

8,17 ft,
RLECTRICITY - The Wain Power Plant employs 5 2-cycle, diesel
operated Fairbanks-Lorsae gencrators with e rated capacity of 210 HP,

142 Ege, each, for a total of 710 K¥s, Also installed at the Power
Plant is one Fatrbanks-lprse gememtor with a rated capacity of 200 EP,

195 Kvs, The total capacity of the iain Power Plant is 710 Kes,
Standby gensrators are located at other strategic spots throughout the inatali.tion to accomodate facilities such as the oomminicae
tions canter, hospital, air operations and instrumentation set-ups,
ate.

Diesel units are directly connested to gemrators which are "I"
_ Current is sent Grvogh ‘trasforme banks and steppedup ‘to 2400 :
wilts.

It is distributed in three Legs by te overhead pole systen,

One leg feeds the north end of the island, the second feeds the south
end, and the third leg feeds back into the unite,
No power failures were experienced during the reporting period,
wos0s o The island road net included approximately 5.58 miles
*

" of asphalt surfaced and traffic bound macadam as follows:

16

BEST AVAILABLE COPY,
REGR NED yNoL g rien
SEC ASY BY DAes
NE DER ORDER
bcaevuid

a

Select target paragraph3