SECTION ZIT
-
MAINTERARCE AND SOUS EXEERPING
a, BacrLImEs (9)
MATER « Salt mter is draws from the lagoon through pumping
stations located om Lagoon Drive st Bidgs 56 (Maia Power Plant) ané
124 (suriliery Pumping Station), It is passed throuch distillation
units a& the Power Plant and is then stored in tanks is the area
adjacent to the Power Plant and in tanks on Bldg St (Eater Tower),
The distribution system includes approximately 6 miles of mins for
freah water and a similar distribution system for salt water servicn
for sewage and Sire aystexs,
Toe Astillation plant used during this period consisted of 8
Cleaver-Brooks coapression stilis capable of producing 60 gals of
Spesh water por hour each or a total of 115,200 gals per hours for
all unite, Light Badger units with @ rated capacity of 180 gule each
per hour or a total of 28,800 gals daily for all waits wre bald ina
standty status (Ses paragraph 6, Bestion Z)e Hexic Capacity ef all
_Aastalled eatte mas144,000 gals per tay,
ler
Storage space foe a total of 274,000 als of ‘galt and fresh miter:
ie available,
Five tanks ta te vicinity of Bag 56 provide for
210,000 gals while tankege o
and 45,000 salt,
Bidg S4 will accommodate 21,000 gale fresh
iene? of fresh water per individual on the
{sland averaged 75 galsdaily throughout the period, This figure
contemplates the total consumption for all purposes.
(9) See TABZ
BEST AVAILABLE COPY
REGSADED UNCLASSIFIED ORDER
SEC Atti. SY D&ivri FER
85-2014
«=