oarry-alls ..4 3/¢ tons were placed in serv.
.
Two fork lifts were
also received,
Operational experience for the period
wast
Month -
Vehicles
Operated
March
april
99
99
Vehicles
- Deadlined
Total :
Mileage
og).
‘
45,626
48,785
He
$+ Rater Transportation. Two LoMs and an AV2 continued in
operation during this period.
AV2 87, previously reported as in sush
condition as to need replaceent, was replaced byanother oraft in
April.
However, at the end of the report period the new oreft had not
yet deen placed in operation due te the peor condition in waioh it
was received, and was in the hands of Folzes and Karver for a final ~
timeeups
.
.
,
Aboard the USKS Sgt Millerwere one motor wbaleboat, one
LOPL, and § Loils, for boat pool augmentation.
These oraft were .. 2.:2. ;
unloaded on 80April and 2 Maye
Do,
gy ate Transportetfons A marted inorease tathe anoint ofair’
at
aoe,‘,
ove teHoeuit
transport required‘within the‘atollwas| Fooorded
daarhag theFopert5:
the sake of‘oamperisons
vonth
March
April
:
"Passenger
Jeary
February
.
Passensors
¥iles Plows
Carried
‘Pilot
Eours
2,809: 0 Me ee
“38,608
26,588
19,247
°
=
°
9
472
°° "$20"
=. 99h.
1108 +
BEST AVAILASLE COPY
SER
aah