C.
ST
BUILD<Ur IN FACILITIES.
1.
Ino reased Use of Facilities,
"as Port Faoilities. The Coast Guard busy Tender Ironwood
arrived at Eniwetok on 2 April and departed on 29 Aprile
During ths
stay of this vessel, two new buoys and. one now channel light were ,
installed, while a other lighted pevigettonal aids were completely |
.
cheoked and serviced,
"
the oargo pier at the southwest of Baiwetok Teland
(cocmonly known as Kain Pier) wes surveyed for its capability of
sustained indreased looal traffic. It was decided that major repairs,
. to inslude the addition of sane new piling, were necessary. This work
was begin during the latter part of April, and was epprozinately 1
campleted at the end of the month,
be
Power and Faters
=
,
with the actual inorease in population,
and the antlotpated future tnorease, the power and distillation facile:
ities were surveyed to ascertain their adequacy. Ho ocnditions of
energensy, nature are antisipated in either foltity, Aithough inareased S
" emphasis on oouserration, enpectally ofater, is ehready being.oes tes
enforced vy wait commanders. z
or
/
: o“table ef water somataappears as Table 2 on
page ES
es
:
Tank Pars Rehabilitation,
oe,
©
ae
To prepere for inoreassed
utilisation of ‘the storachand dispersing fecklitios at the POL tank fara, @ program of major rehabilitation was begun during the report
period, and brought to 90% oenpletion by the end of -pril.
:
,
Several
.
BEST AVAILABLE COPY
REC", ~
me
Su
Su.
—
A e
74 IR
74