cloud tracking eperations had to be continuously md glesely memitored and analysed relative to populated areas contigueus te the tosts sites and neces— sary adjustnants made according te the developing situation; informaticn oa lagoon and taland contamination had to be analysed and reeentry plans made accordingly. On a normal shot, the tempo of the Radsafe operations decrease sed considerably by about H plus 12 Reours, however, the remaining activities (limitedprimarily to cloud tracicing) required the continued presence of a qualified Radsafe officer until Ps least H plus 2h hours. The net result of the above was a shot-phase requirement for additional personnel to assist in the required functions. For this purpose the task force Radsafe staff agency was designated the Radsafe OFFICE during the shot pericd (as distinguished fram the Radsafe CENTER, the primary operational and informational center of the Radsafe Unit of TG 7-2). Additional personnel, were gathered together in the Radsafe OFFICE on a temporary duty basis fer the shot pericd to perform portions of the various fonetions amd te maintain « continuous 2h-hour duty status, These personnel and their temporary assigned duties were as indicated in the functional chart of Tab G. b. The Radsafe OFFICE for shot tines was designed to bo the primary task foree ehot-tine agency fer all radsafe natters requiring headquarters staff action and for all radsate information having an Ampact on the various operational decisions which were expected to arise, Ite sources and channels of information wereas indlested in the Radsafe Cheek List, the functional chart and the communication facilities charte of Tab G, These facilities were, with minor exeeptions, completely adequate for their purpose. e@. as stated above, one of the primary functiens assigned to the Radsafe OFFICE was that of conducting the Radsafe portion of the Command Me |