Paint | Screening 52 Gals. 254 Sq. MM, Mailing Stripe, 1" xX 1* Sereen: Door 350 Lin. MA. 4 Messe Tables, 8! Long u ot AL Laber Lumber Rough Hardware Nails 44,552 BF. Kegs Alumima Ride Cap 1/2" Plywood 18 4190 ly 08 13.00 570 UB Pr. 1.75 13120 S.F. Deor Handles «22 LB ea Door Hinges Seat Cover Hingss Shutter Hinges 20 8 Pr. 152 Pr. Eye Bolts & Hooks Screening 400 ea 256 S.P. fereen Door 3 mening . 325 2885 10 85 - 65 80 5 120 10.00 Lo «15 215 a J. 21 Batling Strips for 4455 145 U5 20 23264 S.F. Single Fiush Deors ~ 38% 1636 L.F. 3/8" Plywood hess Tables. LQ 12.0 This LiF Alumizrum Sheet for Gutter Pat=t Material 6&0 49 350 LP. 15 55 52 Gal. 3.75 195 11.50 130 12 @he HAN Carpenters 3 for 3 weeks » 54 Man Days 15210 Bi Heavy Duty Man 1 Week # 7 Man Days 195 TOLL COST « 1705.00 17,265.00 The above total of 17,165 includes man power furnished by Hid. The above bill of: material is needed to construct the temporary village in ace cordanse with the drawings number Mise. 255 and 256 showing the sizes and con= struction of the various buildings required end as stated in mamcrandum letter dated April 27, 1954 from Mr. Marion Wilds, acting Destad Rep. Ebeye - for the Trest Territory of the Pacific Islends,

Select target paragraph3