Eniwetde Atell, H.I.
30 hpi 195%
ESTAMLISH
TIMPORA Y
We (Holmes & Karver, Ine.) are herewith submitting the following 8111 of
Material and cost estimate toconstruct a temporary village on the island
of Bikej-in the Kwajalein Atoll, Marshall Ialands,
The cost estimate outlined below is based on the followings
1.
~
Construction is to be om Bikej Island.
2. HAM will furnish all mtertal.
3.
.
be
The Reavy will transport the material to Bikej Island - (no cost in-
cluded).
HAM will furnish ce (1) carpenter foreman, two (2) carpenters and
ane (1) heavy equipment operator.
5. The Wavy Station Kwajalein is to fumish the four (4) Hal men housing
and trensportation betwen [wejalein and Bikej <- (no cost included
for transportation).
6.
That heavy equipsent required (grader, ete) is available at Kwjalein
7.
That natives are avajlable for labor and as carpenter assistants ~
8.
That the HAM carpenters are furnished with an interpreter.
9.
HM will furnish portable generator and power saw.
16.
(ne cost included for equipment
(no wages for natives included, but will be fimded by JTF SEVEN).
Tools for native labor will be furnished by Navy Station Kwajalein.
OF
nee BF.
FrasingWaals
egs
Maile f
3 Kege
balla
fer Piped
Cuca)
16944 Sq. Ft.
eiog
B Ridge Cap
Lin.
eine Gutter
3/e
Ft.
1636 Lin. Ft.
727 Sheets
410 Sheets
be
i=
Fipeeed,
Door cence
Door Hinges
4B
48 Pair
Soat Hinges
@ Pair
Shutter Hinges
;
Bye Bolta with Hooks
w 105
1$2 Pair
400