BEE & & & BH
rex eke
DAY. HOR
parens
EVR (Names
ioctcate suction
wr)
First C/S USA and Chairman ABC advisories on proposed
shot time (dual cp messages) (Cowan),
Check status of codes and flight briefing for WB=29's—
(House).
Re-examine need for coaplete evacustion for U,Y,N, 8
based on results of previcus shots (House).
Evaluate waiver of MPEZ for next shot (Maupin).
Get detailed recovery plan from J-3, TG 7.1 (House).
Cneck lagoon water sampling plan with Radsafe officer,
BP
DuS
Get plan for "low order” cr "HE only“ type detonation
Du§
Review heavy nuclide samling plan with 10 7.4 Operaticna
and Or. Plank (House=Maupin).
RR Pe
Task Group 7.3 am 7.1 (House),
Dek
Cheek status of sample return plans (Cowan),
Deb
arrange for reeeipt of 1 7.3 ship intensity reports
Dek
arrarige for "Sweet-Sour" report system with 40 (Wignall).
De3
Brief Sample Return Project Officers (Conan).
Da3
alert JTF SEVEN cyeraticnal personnel for possible PEM
off~etoll, water sampling prodlens (Maupin),
from CTU 7 (House).
(House).
De3
20000
Pase forecast fall-out information to J& reference
significant sector for P2V sweep on D aimus 2 cays (House)
D=e3
2060
Mowe aboard aGC (BIKINI shots ealy).
T2
caco
Radeafe OFFICE cperational on 406 (Hq Compoulkd for
Bed
NU
Radsafe CENTER operational on CVE (Bldg 57 for INTWETCE
De2
1208
arrange for receipt of constant altitude balloon fics
D-2
1200
ENTAETOK shot) (House),
abot )
(Servs).
from Weather Central (Wignall).
Get transient ship plot from CIC of TG 7.3 thru CTU 7
(House).
GaLin
| |