¢. Draft Revort The coueractor shall submic a draft repert in six (6) copies as indicated in A above. This report should include the results of all che research and any findings. Submission ef this draft report should mark the completion of the sajor elements of the contract, except incorporation of the Department's commeats and preparacion of the final report. The DOT shall have cwo (2) weeks ta respond to the draft report. [IF the contractor does not receive a reply or a requese for an extension of time vithin two (2) weeks, the contractot tay assume the content of the draft report {fs acceptable. The DOI may, ae its option, request a meeting with the contractor to discuss the draft report during the two (2) week review period. ‘Delivery: De. Six (6) weeks after contract award. Mnal Report After receipt of the departmenc's commence on the draft report, the contractor shall prepare and submit the final report to the Deparscment in six copies as indicated in A above. The Department will have two (2) weeks to review the final. report and indicated to the contractor its acceptability or ainor modifications required. If the contractor does not receive a reply from the Department within two (2) weeks, the contractor say presume the final report is acceptable. After acceptance or minor modificarcion of the final report, the concractor shall prepare and submit thirty (30) cepies of the final report and a reproducible copy to che COTR. to the Branch of Contracts. Initial Delivery: Seven (7) Final Delivery: Eight (8) E. One copy shall be sence weeks after contract avard. weeks after contract award. Brieficgs At a time to be arranged by the COTR, bute no earlier than the twenty firse week of che contract, th= contractor shall arrange co have key scaff, consultants and subcontractors in attendance at a meeting at the Departzsens of che Interior, washington, D.C., to present their specific assignoents and areas of speciality and the answer to questions on Western ccal industry from Department personnel. Article V = Period of Perforzance The contractual period of performance shall be for of the contract award. two months from the date — Article VI = Government's Estimate of Workload The Goverusent estimates workload for this proposed project to be fortzeeighe tman~aonths. 18

Select target paragraph3