Wg ae ZUNI) w* - Project 6.5 - Analysis of Electromagnetic Pulse Produced by a Nuclear Explosion - Charles J. Ong OBJECTIVE The objective of Project 6.5 is to obtain weveforms of the electromagnetic radiation for all the detonetions during Operation REDWING, This data is to be used in connection with a continuing study relating the wave form parameters to the height and yield of the detonation. INSTRUMENTATICN Two identical stations are used to record data, one at Eniwetok and one at Kwajalein. The instrumentation consists of a wide-band receiver with separate outputs connected to each of the three oscilloscopes. Mounted on each oscilloscope is a Polariod Land Camera for recording the transient display. RESULTS Station As Eniwetok The predicted field strength ee.: 16.0 volts per meter, meter. ey The measured field strength I 14.4 volts per ‘The general waveform for the 1.0 ~ sec/cm sweep was poor but the waveforms recorded for the other two scopes were good. Station B: Kwajalein No record date due to the loss of timing with WWVH. CONCLUSIONS All date hes been forwarded to Evans Signal Laboratory for final analysis. -@L-

Select target paragraph3