Material needed for field wrk to be provided by the contractor for the Atomic Snergy Commission A. Equipment for collecting material, such as nets, bags, spears, hooks, lines, buckets,etc. Be Equipment for weighing, dissecting and ashing of samples, such as, scales, dissecting tools, ashing ovens, stainless stéel plates, shipping cartons, etc. C. Rotenone and other material used to collect fishes. D, Containers and preservatives for’ storage and shipment of collections. Finances A. A modification will beneeded to the basic contract W-28-694-eng-33 to authorize the travel, expense, insurance, ete. B, * further modification of the contract W-28-094-eng-33 must be made to extend the time during which the contract is active. C. A supplement to the basic contract increasing the amount of money allocated should be executed. As near as we can determine the field trip as described in this preliminary outline will be of a out the same scope as the one conducted in 1947 when the cost was §25,000. US DOE ARCHIVES 326 U.S. ATOMIC ENERGY COMMISSION Collection Box | Folder // 52 DS SK co go é 2 heReece me le —— on DOS ARCHIVES

Select target paragraph3