A. 2. (b)- (9) Location; Mines Read f{eontinved)
Sampling
Times (PST)
& Dates

Volume
cubic

Net counts per minute after sampling terminated
(figures in parentheses are hours and minutes decay)

meters

Combined Beta~gsma

1555, 10/21

Ula?

1152(48)

1555, 10/26
1345, 1/2

63706

2&707(1)3 12725(50)3 13724(69,53);
9873(99,29)3 7733(122,11)

1555, 10/28

5555

10/

(6, OF

3/7,%3

340-44

/92.%4¢

246.10

Alpha

17(48)
313(1)3 65(50)3
50(69,52)3 45(99,27)3

23(122,13)

(10) Location: Site 300, C.Ps

1030, 9/30

1262.1

193(49)

2.64

21(49)

1330, 10/7

3260.1

1860(50)

%-°7

0(50)

1315, 10/25

1124.1

20007(4,0)3 1723(sic)(53)3 10032(72,27)s

1330, 10/7
1315,
315, 1010/27

1040, 12/1

4.37

T197(102,22)3 5812(125,4,)
101,79

$2.20

‘$1.99

320(4,0)3 64(53)3

51(72,25)3 26(102,2h):

21(125,4)

(11) Location: Site 300, Butte Field

0945, 10/6
1215, 10/7

180.1

33(50)

2°

9( 50)

Select target paragraph3