wow

wr rrr soos nr ee

wer err ey

Or eee ewe

ing, internal audit, material and property accounting, and payroll
and timekeeping.

(4)

Tu-k - Operates Holmes & Narver engineering and design

(5)

TU-5 - Performs construction and maintenance through Area

office, estimating and analysis department, survey operations,
material testing facilities, and AE construction inspection service.
Superintendent.

Provides carpenters, electricians, heavy equipment

operators, mechanics, plumbers, sheet metal workers, painters,
sandblasters, and steel workers to perform EPG construction and

maintenance as directed.

(6)

TU-6 = Operates camp facilities at all EPC locations

except FRED and JAPTAN Islands. Supervises Holmes & Narver marine
operations and power and distillation operations.
(7) TU-7 - Operates Holmes & Narver supply activities, including material control, material coordination, material take-off,
property, stevedoring, and warehousing.
ce

All Headquarters and Task Unit Commanders are responsible:

(1)

For the radiological safety of their personnel.

(2)

That personnel under their command comply with jobsite

(3)

That personnel under their command are adequately in-

(4)

That personnel under their command comply with current

health and safety directives.

structed for emergency operations prescribed in jobsite Natural
Disaster, Hostile Alert, and Evacuation Plans.
security regulations.

d.
For security procedures, rad-safe procedures, Natural Disaster Plan, Hostile Alert Plan, and pre-shot camp evacuation procedure
see TG 7.5 SOP.
e.

Reports - as directed later.

=~ 3+

ae,

Select target paragraph3