thot.
é
at
J.
we 2S NOG SGAUS
beon recovered at this writing.
The eecend test, for which nose tip separation will be programmed to
ccsur during descent, was postponed until the results of the first test
have been reduced and analyzed.
Vo
Field Service
Field service will be supplied as required for operations at PPG.