=a
-

A paper on PWR characteristics was considered,
PWR

It was particularly

noted that the estimated operating cost (3000 hr core) ‘was 61.9 mils/iwh
of which 39, 7 mils/kwh was for reactor core fabrication, At least one
member of the Committee felt that the Committee should ‘yepister a protes

on these costs, —

:
:

°

.

at

SEN

Two papers, AEC 493/30 and AEC 3714,/8, on the ‘subject of BRMBa sia.

tea been forwarded to the Committee,

The first contained a letter from

peer Ar. Bradbury to Gen, Fields, dated January 18, 195k, which ‘commented on
_ the need to minimize the

eo
v The second paper contained a letter from

Dr. Froman to Gen. Fields, dated January 21, 195k, regarding an analysis
A“

of the evidence on Eee fromthe 45 nuclear tests to date

DOE AEVEIVES

Select target paragraph3