Te, coe ee
— wenees - 5"

10-15,

(The discussion focussed on the number 10, since this seemed to }

the Umibation that the Commission was actually considering.)

The

Committee could bee no technical or safety reasons for fixing on the
number 10,

.

A better policy would be to shoot whatever nunber are nece ssi

and practical, appropriate precautions being taken for each shot.
| (Appendix B)
The Committee next considered the linked subjects of Ee :
qistonion quality, and production of materials,

Otpleasure that the problem of producing 20 n/g-sec
a
now seemed less formidable,

Dr, Rabi expieesed |

("200 g/T") plutoni=i

However, the need for material of this

quality had not been demonstrated.

Dr. von Neumann pointed out that some

quantities of high grade material would continue to be needed as long as

there were new weapon designs to be tested, in order to eliminate’ plutonium quality as a factor in the test results,

(He referred here to

tests necessary in the development of new designs rather than to proof .

firings.)

(Appendix C, item 2)

Greater knowledge and understanding is required on two technical
et

\ 4

ae

pt

2

ws.

lproblems:

(1)

a ene

Trae

DOE ARCHIVES

14>

Select target paragraph3