instruments.

Recovery was tezun on 8 April and completed on the

‘ corning of 9 April.

gee

Pesults.

-

Detectable amounts of fall-out were collected at the

stations.

"Tete

Yarochi, Uorikku, Romurixku, Aomoen, Bikini, and Enriirikku
Several 16 sq. in. tray samples at recovery read up

to 200 mr/hr at 1 inch when surveyed with a AN/PDA-T1B instru-

rent.

(The background was 10-15 mr/hr)

Most ofthe higher

reedings were found in the early time intervel samples, however,
detectable activity continued to be found in later samples from
these stations.
at Parry.

Ten samples were measured for early gross decay

The decay slopes ranged from -1.1 to -3.4 for the

period M+3 to M+19 days.

No trend in decay rate wes exhibited

for either the early or late fall-out.

he remainder of the

,

.

/

7 GA

.th Teeter a wae

Copied /DOE
LANL, J-Olw.

se

© PepEmERNTEOy ee

orwE sew) 5.

noe te

Seb Gog bate

yy

Samples were returned to the Army Chemical Center for analysis.

Select target paragraph3