4
»

Project 6.5 - DECCNTAMINATICN AND PROTECTION
Project Officer ~ J. C. Maloney
Objectives
The objectives of this project were to determine relative contamination
and decontaminability of outside construction surfaces exposed to fall-out
BEELGLCD
Instrumentation
A set of fourteen

ft sq panels of widely used exterior construction

surfaces was mounted at normal orientations on the barge anchored at Station

650 (approximately 7 miles SW of Ground Zero),

It was expected that this ~

station would te in the fall-out area following the shot.
Procedures
The barge was towed to Farry Island eighteen hours after the detonation.
The panels wers unloaded and transported to the dacontamination area where
they were mounted on racks at normal pitch and spaced far enough apart to
minimize background effects.

Then the panels were subjected to high pres-

sure hosing and water scruboing techniques.

Gamma and beta intensity readings

ware taken at 16 points on each surface initially and after each dscontaminaticn procedure.

For comparison,

these readinzs were ccrrected to a common

basis of H + 28) hours (tims of initial survey) dy the use of the -1.2 law.
Pesidual intensity levels in cercant wire calculated for aach decontani“ation srocedurs used,
Pasults
Tne averacs initial panca intensity and residual intensity percentages
eo sunnmarized in Table 6,S=#l for each surface.