Operations Plan - Mission No. 10 FY 1979
Page 3
3.
Insure one medical trailer installed on starboard side of
Ship and whole bedy counting components are aboard by
August 17.
4.
>.
Insure all BNL and vessel cargo is identified and put aboard
vessel.
Same with gift food per phonecon with PASO.
Identify and make available a vehicle (4 x 5 pickup or van)
for BNL use.
6G.
MAC arrangements back to Hono.
7.
Arrange to have portable generator,
8,
Linens, etc. for scientific bunk quarters.
9,
Vit.
and electrical cables on board.
16MM movie projector
Insure 2 whalers, 2 drums pre-mixed outboard gas and 2
drums diesel aboard.
FUNDING
Program charges for this mission are to be recorded against
BNL
Ix.
(Nat
Greenhouse)
purchase order with
Holmes
& Narver.
REPORTS
The Party Chief and the DOE/PASO Representative will prepare and
circulate mission reports within 30 days after completion of
the operation.
Specifically, as agreed at the Livermore scheduling
meeting of July 24th, the reports should be circulated to all DOE
and contractors involved.
In this case reports should go to
Drs. Wachholz, Weyzen and Pratt, Roger and Bill Stanley.