Scope of work to be performed prior to,sailing for the conversion of the vessel

to meet operational requirements.

Clean and remove all material from #1 and #2 compartments.
Remove existing ships freezer and lube oil tank from #1 compartment.
Install plywood flooring over existing deck in both #1 and #2 compartments.
Install floor covering in #1 and #2 compartments.
Install A/C (approximately 3 tons), utilizing commercially available
equipment.

Fabricate dog-house forward port side adjoining existing head for protection

of A/C.

Remove 3 hatch coaming, main deck, and replace it with soft hatches or
bolt ons.

Lag #1 and #2 compartments.
Remove bunks and compressor from forward area.
LO.

“Ui.

12.

Install dog-house and staircase for access to #1 compartment.
Penetrate #2, 3, and 4 water tight bulkheads, install stuffing tubes and
feeder cables from 30KW generator.
Install 2 commercially available fiberglass shower stalls adjoining starboard

forward stair case.in #1 compartment.

Install one sink.

13.
14.

Plumb one as head and one as shower —

Install hot water heater in #1 compartment.
Remove existing stern canopy — replace with steel deck.
deck.

15.

Install canopy over entire boat deck area.

1p.

Install tables and seating for 12 people on boat deck.

17.

Contract for fabrication of two small landing barges.

5o00bb49

Install gangway to