Gust:
At shock arrival time, the gust load was 62% of limit wing
bending at Station 493.0, the critical station.
Bomb bay doors showed
visible evidence of minor re-buckling on the same aft sections which were
buckled on heft).
Peak overpressure measured was 0.59 psi at H+57 seconds.
- 58 -
QS \
Overpressure: