Pc itte Smee trfetgg bete te? chone (eter 451) vas J stelle Aca 12 Uhre 1952 ord neeci. cy office furniture procured, Bote tag on Ly Merch 1952 a progress report vas sulitted to ~~ Reatousrtors, 2075ih air Weather Wing every to wezks. This report ined in Paragraph 44(2) of air Weather Services Cperations Plain st Gated 27 February 1952. roa l7 through 19 March 1352, Cod Nelson, Ussdgeorters, iis tary Air Transport Service, Lt Col Barnsy aid Cept Sullivan, Keidquarters, Air Weather Service, and Col Ssith, Lt Col Miller, Lt Col Throg~ verten, Naj Braude, Capt Leice:cr and air Weatlar ing’, act t Leve, Esalguirtcz.s, 205¢th aa conference hold ty the Comunder, Task Group 132.4 at Kirtlend Air Force Exse, Now No:dieo, wag to discuss the following ite;s: Task Group 132.43 Ths confcvence Mierten and ercoisaitoa of Air ccncept of operations; porscmel end adrinistra= ticn to insivés ssourkty, Fowl and ucvewwnt divsstives, cpevoticsas, meterlel, capply, maintenance, transportztion, and tudgst and fiscal. Prooless to be resclved, in addition to those discussed in the conference notes” ares What will be the assignrent status of partici- a nnee ee pating personnel during the project period? May personnel alerted for PCS assignments to units of the 213d Air Weather Wing be utilized on TDY enroute to goining orgenization? Can participation on this project regardless of assignment status, be considered as ceeting the require~ ments of an overseas tour, with date of return from project DROS for 4. Refer to App #2. 6. App #5, cy of Conference Notes, 5. App #h, cy of 2059 AkW SO. 2 BEST AVAILABLE COPY