ec. Test Support Unit: (1) Assure that transient traffic and airlift operations do not interfere with or endanger test aircraft operations during the training period. (2) (See Annex A). Provide two (2) C-47 aircraft for VHF relay for the re- hearse and other test missions as required. P). (See Annex (3) Establish required measures to prevent movement of vehicles from interfering with or endangering air operations throughout the training period. (4) Provide adequate crash removal and fire fighting protection for all air operations during the training period. (5) Place one (1) H-19 helicopter and one (1) AVR crash boat under the operational control of the AOC for SAR alert during the training period, (See Annex F). (6) Assure adequate refueling and field maintenance support for all aircraft during the training period. (7) Provide photographic coverage during phases of the train- ing period, for historical purposes. (8) In coordination with other Test Units, assure adequate transportation schedules from the flight line to the dining halls and billeting areas throughout the training period . (9) (10) Coordinate with Test Aircraft Unit to assure that C~47 reflector aircraft are marshalled as required by that unit. Provide for aircraft decontamination training. x. All Units: (1) Provide liaison officers to assist Headquarters TG 7.4 aircraft controllers in the AOC, on the Command Ship and Control Destroyer as required. (See Annex K,Aireraft Control, TG 7.4 Operations Order 1-53). (2) Coordinate with Test Services Support to arrange required early dining schedules, in-flight lunches, transportation, etc. (3) Adhere to security procedures as outlined in Annex G, Security and Public Information, TG 7.4 Operations Order 1-53. (4) Emphasize the Flight Safety Program outlined in Annex L, Flight Safety, TG 7.4 Operations Order No. 1-53 and other directives. (5) Be prepared to augment existing SAR facilities in emergencies during the training period. (6) Be prepared to postpone execution of the mission for such periods as are made necessary by adverse weather or other J | unforeseeable events. TASK GROUP 7.4 OPRS ORDER NO. 1-54 ‘ 3 (See Annex V). —F=PL.wae