TO:
RSt
Engineering Manager
Fuel Tank Inspection, Site Fred POL Farm
Vertical
esel Tank No
=
h March 1959
Page 4
Continued
Exterior: Top is generally rusted and pitted with no apparent penetration.
Sides: Flanges and seams are clear of corrosion. Only one or two rust boils
on side panels,
There are no apparent holes thru the metal.
RRG: jm
ect
Manager, Engineering & Construction
Chief Project Engineer
8. HH. Willes
H/O Chrone
H/O Project File
H/O Bree Asst (AEC Facilities)
J/S Chrono
J/S Central
J/S Ingineering
J/S Test & Inspection Dept.
J/S Engineering Reading File