Reproduced frongyt¢wioldist
da

HOLMES & NARVER, Inc.
ENGINEERS-CONSTRUCTORS
_ TO:

Chief of Operations

rrom:__Ng¥sy 0/0 Division

sop. 884

sg,PISCALYEAR1954 BUDGET ~~ PLANT AND EQUIPMENT
nae. March 20, 1953

necessary switchgear and transformers.

not ineluded in estinate. )

1,
2.

A@ditional 1,000 kw generator
with switchgear
Procure and lay cable

$ 158,000
346,000

Subtotal
(Note:

(Thia second generator

$

504,000

The work desoribed above has been modified considerably
by an engineering study which will be submitted for approvel of the Field Manager probably this week. The
engineering study and estimate of cost will include additional work on the Elmer and Fred distribution systems
not noted above; however, the changes will provide mich

needed capacity to the distribution systems, and it is

believed the work can be accomplished for about the same
amount of money as estimated above. It is expected the
Field
r will approve this new electrical distribu
tion plan

approrinately

Procure and construct an eluninum

bu
of approximately 12,100 square feet area,
equipment to be furnished by "military services,
1.

Procure and construct

12,100 sq. ft. © $15,00

Subtotal
(Note:

Operational

$131 600

$ 181,0C0

Engineering will prepare plans for this building for ap-

proval of the Field Manager.)

Herenouees

Procure and construct two 40' x 180! and one 40!

x 100' prefabricated alwainun warehouses similar to those
reoently constructed on Elmer,

1.

Procure and construct
18,400 aq. ft. 4 914.42
Subtotal

Total item il
(Note:

«$=

260,000

$

260 ,COo

& 945,060

Col. Sackton was advised at the Jobsite that the Army

should firm up their warehouse requirements to indicate

ake

5 ia ™~ — rm { mrs —