Reproduced rom

esidf

{ihe National Archives

HOLMES “4peathaeRegion
ENGINEERS-CONSTRUCTORS

.

Chief of Operations

To:

Mer -, 6/0 Division

FROM:

joke
FISCAL YEAR 1954 BUDGET —- PLANT AND EQUIPMENT
REOe
DATE:

(Note;

Mardh 20, 1953

This item has been previously included by Mr. Gilleran

as an Engineering Change Order and, as such, funds

should be available for this work as soon as Mr. Spain
hes approved the proposed layout.)
F.

As

SeverExtension: Sewer extensions must be provided to connect
new warehouses and barracks to the sxisting collection system.

1.

Sewer extension end manholes
Subtotal

G.

~

$

19,6000

Water line loop extensions are necessary

to
to provide aos the new barracks and for fire protection.
l.

Ae

$19,000

2.

4" fresh water main

6” salt water main with fire

§

hydrants

Subtotal

20,000

45,000

#

65,000

$

35,000

*

35,000

H,

aa

1.

Electrical distribution
extension

Subtotal
i.

eens

3}
E
s
Extension of existing island telephone lines and equipment to provide facilities for expanded
operation.

i.

Commnications extensions

¢_

15,000

Subtotal

@

16,000

Totel Item 1
II,

£

981 ,0CC

Fred

A.

FaojlitiesAditon: Install ons 1,000 kwgenerator
in existing epeace in Elmer power plant.

Elmar to Fred,

Lay two cables from

Prooure one additional 1,C00kwgenerator in

FY 1955tor delivery and installation in *FY 1955 along with

Select target paragraph3