PR se

fredgithe-fp penes-df} the National Archives

HOLMES] %

ENGINEERS-CONSTRUCTORS

10:

Chief of Operations

_ JopBBA

From:_Mgr,,Division=© _—s_reFISCALYEAR1954 BUDGET -—— PLANT AND EQUIPMENT =
pate: March 20, 1953

(Note:

Engineering will prepare plot plans and details as

necessary to show the location of the above barracks

plus the sewer extension, water line extensions,

electrical distribution extensions, and communications

extensions covered in Parts F, G, H and I to follow. )

t
: Gonstruct a one-wing addition for dining
facilities to provide space so that serving can be accomplished
in two seatings in mess hall,
1,

Proeoure and construct
2500 sq. ft. & $19.00

(Includes tables, chairs, etc.)
Subtotal

(Note:

$

48,000

@ 4&,C00

Mr. Howell will provide Engineering with any special
operating requirements, such as seating arrangement,

in order that the billof material for the mess hall

wing will allow ordering of the complete‘eanipment as
needed. )

toLaundry
ing leundry.

To

Construct a 24° x 40! addition to exist-

inolude a pantsepressim, unit, shirt—-pressing

unit, extractor, washers, and water sopler.
1.

Construct end install equipment

Subtotal
(Note:

38,000

%

38,000

Mx. Howell will provide Engineering with necessary information as to additional equipment and equipment ar-

rangement required for the addition to the Laundry.)

Gallery
— Wat
Station: Xxperience with
the new salt water pump station which is used for circulating
coolant water in the power plant has shown that moss and other
sea growth has to be filtered to prevent stoppage of intake

lines.

l. Infiltration gallery
construction

Subtotal

$ 41,006
§ 41,000