Table 1.
Results of Interlaboratory Calibration of an Electrodeposited
Pu Source.
242,
239-240),
238),
D/M
D/M
D/M
8.83
8.80
8.83
8.42
8.63
8.24
4.09
4.57
4.63
4.57
3.93
5.00
0.76
0.78
0.83
0.72
0.68
0.77
Mean X =
8.62
4.46
0.76
One Standard
Deviation =
0.247
0.390
0.052
2.86
8.76
6.8
Percent
22
Bat on.
Deviation =