anmal maintenance cost, and approximately ¢ > FFE, 000 per year (Inclosure C) «= the cost of maintaining the test support organization cadre. f, That the investment in funds required to maintain this concept is well justified, from the point of national security, by retaining a capability to resume testing on short notice and with a minimum loss of proficiency. ge That the lead time to establish the test support organization and test site will be 3-6 months. he That the test support organization will be capable of receiving test projects at Johnston Island and supporting other types of test operation within the lead times of the technical projects provided 90 days warning time is civen. 7. Recommendations: The committee recommends that: (1) The "test when ready" concept be recepted as the best solution of maintaining a cancbility to resume testing in the light of current estimates of the vcrobabilities associated with muclear testing. (2) The nucleus of a test support orranization be established on a permanent basis, with the organization as shown in Inclosure ‘. (3) Johnston Island be specifically desiznated and prepared as a ready test site. (4) The first mission of the test support organization beto determine, in coordination with the DMA. for the AJC and DASA for the DOD, the minimum requirements for the preparation of JohnstonIsland as a ready site,

Select target paragraph3