~ (10) Provide for complete care, storage, and issue of personal
equipment to all air crews of the Test Services Unite
ce

Test Support Unit:

(1) Assure that transient traffic and airlift operationsdo not
interfere with or endanger test aircraft operations during

the BeDay mission,

(See Annex A)

(2)

Provide two (2) Cn47 aircraft for VHF relay for the B-tey
mission, (See Annex ?)

(3)

Establish required measures to prevent movement of vehicles

from interfering with or endangering air operations throughout
BeDay,

(4) Provide adequate crash removal and fire fighting protection
for eetair operations on B-Day.

(5)

Place one(1) #19 helicopter under the operational control
¢
of the SAR Element commander and one (1) crash boat under -

the operational control of the AOC from 27 February 1954 and

continuing throughout the project.

.

(See Annex F)

(6) Assure-adequate refueling and field maintenance support for

all aircreft. during the B-Day mission.

,

(7) Provide photographic coverage during BeDay operations for
historical purposes,

(8) Incoordination with other Test Units, assure adequate trensportation schedules from the flight’ line to the dining halls
- and billeting areas throughout the B-Day operations.

(9). Coordinate with Test Mrcraft Unit to assure that C-47 ro‘flector aircraft are marshalled as required by that unit.

(0) “Provide for aircraft decontamination,

x All Units:
(1) Provide lieison officers to assist Headquarters 1G 7.4 air~

craft controllers in the AOC, on the Command Ship and Control

Destroyer as required,

(See.Annex K)

(2)Coordinate. with Test Support Unit to’ arrange required early
“dining | ‘schedules, in-flight Junches, transportation, etc.

(3)
,

Adhere to security procedures as ‘outlined:in Annex G, ‘Seourity
and. Public Information, TG 764 Operations °Order 1-53.

(4) Emphasize the Flight Safety Program outlined in Annex L,

FlightSafety,TG 7.4 Operations Order 1-53 and other directives, |

(5) “Be prepared to augment existing SAR facilities in emergencies
during the BeDay operation.

(6): Be prepared to postpone executionof the mission for such

periods as are made necessaryby adverse weather or other wme-

foreseoable2 events.