7;
Reproduced from.the holdings of the Natiotat
e
a
HOTMES Sagar
ane ee Reet TO:
Navid L. Narver, Jr.
JOB:
re:
rrom:___I's Le Dietze
S84
0G 6836
40% 188
_
Orientation of Station 103 ~ Olive
26 September 1953
DATE:
| C
Veen”“tT
¥
Because of an error in surveying which did not show up in checking
the Field notes, Station 103, Olive, has been constructed on an
azimuth which is in error by 12° ~ 50! - 36". The axis of the Station
now lies on an azimuth of 271° - lot - 34.0" instead of 284° + OLt.~
10.¢" as called for on the site plan (DiG. 2254-00-17),
working point is in the correct location.
The
+o
This error was discovered Sept. 18, 1953, and the following day
2. A. Boettcher consulted Norm Littrell and Jamie Shumvay of ALO
to determine the significance of the change. These centlemen stated
that so far as the use of the building was concerned, the rotation
vould make no difference, and since the station is an earth covered
blockhouse, it is hoped that there will not be a structural problem.
Unless other instructions are received from tie Home Cffice, we will
assume that the station is satisfactory as constructed.
Cvery possible measure is being taken to prevent the recurrence of
Such an error.
BEST COPY AVAILABLE
“~
a
A.Lhe.
ol
H. L. Dietze
Lo
y
resident sin;ineer
ALD si shiv
ce:
HO Chrono
“
ina
a0
Re 3c
ATOMC
3cé & 470%
COLLECTION
OL rentral
Engrs(2)
OS
y
Surve
BOX No, 129624 (608) Alb334
© SURVEYS
FOLDER Aves 4
ga
ft
MATIOWAL ARCHIVES
=[0
PACIEIC SOUTHWEST REGION
REPOSITORY
HO Central
OS Chrono
rf; foes
|
S
ENERGY COMMIT
(SS1OM
326 -6S var70
1953 CN
noeetennermetNP
RT MNAT TeePe"AT}
An
creeaOTTI
At ety
—
DEPARTMENT OF ENERGY
RENTnna
GY TECLASSICATION
ELAS
TactWHEANEW A SHOIEED BY. | 5
6 COREL BE PAS)
. ee
'
|1
ASV EWE
| MAME:
| DATE
4
Jf
WTRALT
ei
EIE TY
TD
SP TREE
iF
Bh
eai
> vn
-
m1.
Bee
eee
aeee 1
tnetige dak fp Apne OrtA
,
fle!
;
—_—