commpennl 6 Page Four G. W. Johnson 1. COFAA=317 Laundry 2. 3. 4 5. 6. 7. 8. 9, 10. Complete messing Post Exchange Post Office Barber Shop Bar Libsury and reading room Movies Medical service Snack Bar i 14. Carpenter) (For diagnostic program support) Mechanical maintenance men (2-4 in support of diagnostics) ll. Electricians (2-4 in support of diagnostics) In the interests of economy, it is advisable to maintain a skeleton maintenance crew aboard between operations but not supply the H& functions during that interim. We urge that the ship be made available in a San Francisco bay port facility by 1 July 1957. At this time we will start the job of modifications and, later, scientifc equipment installation. It is anticipated that the periods required in outfitting would be divided in three phases, each complete on the date as indicated: PHASE I (1 July 57 to 1 November 57) Basic Major Modifications Installation of cabin spaces as required. Installation or modification of existing controllable mounts. Shipyard maintenance and dry docking. Installetion of air conditioning as required. PHASS IT (1 December 57 to 15 February 58) Instrument Installation - Mounting and wiring of diagnostic gear. Installation of diesel generated instrument power as required. Preliminary electrical check outs. PHASE III (15 February 58 to 15 April 58) Instrument Proof and Sea Trials Final checks on scientific gear before sailing from Z.1. period. Chandlery Sea trials (2 or 3 one day runs) as necessary for final adjustagf