commpennl

6

Page Four

G. W. Johnson

1.

COFAA=317

Laundry

2.
3.
4
5.
6.
7.
8.
9,
10.

Complete messing
Post Exchange
Post Office
Barber Shop
Bar
Libsury and reading room
Movies
Medical service
Snack Bar

i
14.

Carpenter)
(For diagnostic program support)
Mechanical maintenance men
(2-4 in support of diagnostics)

ll. Electricians

(2-4 in support of diagnostics)

In the interests of economy, it is advisable to maintain a skeleton
maintenance crew aboard between operations but not supply the H&
functions during that interim.
We urge that the ship be made available in a San Francisco bay
port facility by 1 July 1957. At this time we will start the job of
modifications and, later, scientifc equipment installation. It is
anticipated that the periods required in outfitting would be divided in
three phases, each complete on the date as indicated:
PHASE I

(1 July 57 to 1 November 57)

Basic Major Modifications
Installation of cabin spaces as required. Installation or modification of existing controllable mounts. Shipyard maintenance and
dry docking.
Installetion of air conditioning as required.
PHASS IT

(1 December 57 to 15 February 58)

Instrument Installation

- Mounting and wiring of diagnostic gear. Installation of diesel
generated instrument power as required. Preliminary electrical check

outs.

PHASE III

(15 February 58 to 15 April 58)

Instrument Proof and Sea Trials

Final checks on scientific gear before sailing from Z.1.

period.

Chandlery

Sea trials (2 or 3 one day runs) as necessary for final adjustagf